Overview
A Greenfield construction project of a new administrative office for an Indiana Pharmaceutical Manufacturer required building commissioning of all utility systems, including HVAC, chilled water, plant steam, heating hot water, compressed air, electrical/lighting, and sanitary and storm sewer systems.
The Solution
The pharmaceutical Manufacturer retained Performance Validation (PV) to perform the building commissioning. PV was responsible for the planning, development, execution, and summarization of the commissioning deliverables.
Planning:
Construction Quality Oversight:
Review, assembly of system turnover packages:
The Results
All systems were commissioned and turned over the Owner to meet the building occupancy schedule, within the allowable budget. All building commissioning work met the customer’s quality expectations.
The Benefits
The completed project increased reliability, life expectancy, and operational efficiency of the building systems while reducing operational costs of building systems, including HVAC, steam, hot water, and chilled water equipment.
About Performance Validation: Performance Validation is a 100% employee-owned company has been serving the life science industries since 1988, and is a nationwide leader in providing validation, commissioning, and quality services for pharmaceutical, biotechnology, and medical device manufacturers.
For additional information, please use our contact us page or contact:
Brad Henry
Vice President/ Division Director, Indiana
Performance Validation, Inc.
5420 W Southern Ave, Suite 100
Indianapolis, Indiana
(317) 248-8848
(317) 727-8495 Mobile